Loading page content…
Loading page content…
NEDDC wishes to appoint a contractor for the design, supply, installation, integration, commissioning and handover of replacement gas-fired boiler plant at Eckington Active. The installation is required to provide supplementary, resilience and back-up heating capacity to the existing ASHP-led heating system.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →