Loading page content…
Loading page content…
Glass Systems and Envelope — Barbican Renewal Programme. This is a bespoke glazed envelope design-and-build package, not new-build construction, on a part Grade II listed and Heritage sensitive building – The Barbican Arts Centre. The works comprise new glazed envelope and façade systems to the Conservatory and Stair 8, following directly behind the demolition (by others), which removes the existing glazing first. The package includes primary steel structure to the Conservatory and Terrace, and the façade access/maintenance walkway and associated gutters and louvres. The scope of works includes: - Conservatory roof and vertical glazing: louvres, vents, perimeter benches, insulation, aluminum paneling, doors and associated gutters, including the Arid House. - Steel structure relating to Conservatory glazing: primary steel structure supporting the Conservatory roof and vertical glazing systems, carried within this package's own Contractor Design Portion. - Conservatory Lantern: re-glazed roof lantern. - Conservatory Roof lights: Level 02 office roof lights and associated overhead glazing. - Garden Room glazing, doors and associated gutters: refurbished steel framing to Lakeside Terr
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →