Loading page content…
Loading page content…
The works required are to resurface a section of road on the B5305 at Hutton-in-the-Forest, traditional surfacing techniques bituminous material construction have been tried on these sites and have failed in a short time period. The site has high traffic volumes and HGV usage, road works also cause a lot of traffic and business due to the long diversion route and the road being a link from the M6 at junction 41 and west Cumbria/Wigton, therefore we require a different surfacing technique which will provide a long life is required.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →