Loading page content…
Loading page content…
SCOPE OF WORKS • The client is to provide a crash deck below the ceiling above the main stairwell with an access tower into the loft hatch with a platform to safely lower waste from the loft. • This will ensure of no risk to the other building users being struck with debris on the floors below and removes the fall risks over the stairwell. • The erection a sheeted exclusion zone at the entrance to the works area with an area to primary decontaminate • The use of oxford matting and lightweight Youngman walk board boards with handrails where applicable. • The controlled removal and disposal none asbestos MMMF loft insulation throughout the loft space (approx 500m2 areas are 4 layers thick) of the Clinical Practice centre the removal of all associated rubble on the back of the fixed ceiling followed a clean of the work area.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →