Loading page content…
Loading page content…
Energy Coast West Cumbria Limited, trading as BEC, invites tenders for the design, manufacture and supply of a factory-integrated, modular Adiabatic Compressed Air Energy Storage (A-CAES) demonstrator plant for the BEST CAES project at Westlakes Science Park, West Cumbria. The requirement comprises an above-ground, transportable system incorporating compression, thermal storage, expansion equipment, compressed-air storage vessels, power electronics and controls, together with specified testing, documentation, training and warranty support. Required performance includes 0.333 MW charging, 1.0 MW discharge and a minimum electrical round-trip efficiency of 80%. The maximum contract budget is £1,600,000 excluding VAT, with operational handover required by 30 June 2028. Long-term paid maintenance and supplementary rapid-response hardware are excluded from this award. The procurement will follow an open procedure and is subject to funding, planning permissions and necessary approvals.
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →