Loading page content…
Loading page content…
The purpose of the Scheme is to increase capacity, improve journey times and the reliability and resilience of passenger services that serve the Greater Cambridge area. To achieve this purpose, the Scheme will connect Camborne with Cambridge by a guided bus route. Description of the Scheme Works: • A mostly segregated guided busway and adjoining emergency and maintenance access track to also be used for active travel; • public transport stops; • operational lighting; • bridges over the M11 motorway and Bin Brook; • signalised junctions where the route crosses existing roads; • Travel Hub (Park and Ride) providing spaces for cars, bicycles and coaches; • amendments to existing highways and accesses, parking arrangements, drainage and the construction of fencing, environmental mitigation, earthworks and landscaping; • along with other ancillary works as required. It is intended to procure the works via a 2-stage tender process utilising the NEC4 Option C form of contract including X22 Early Contractor Involvement. The outline Scope for the stage 1 works includes: - • Undertake all necessary surveys • TWAO Design validation • Preliminary Design • Detailed design • Detailed
BidWriter drafts your responses from your company profile, scores them against the marking scheme, and tracks your whole pipeline. Free to start — no card needed.
Start free →